A bathroom renovation is one of the most impactful upgrades you can make to a Melbourne home — but costs vary enormously depending on size, finishes, and complexity. Here's what you can realistically expect to pay in 2026.

Bathroom Renovation Costs at a Glance

Bathroom TypeTypical Cost Range
Small ensuite (under 5m²)$12,000 – $22,000
Standard bathroom (5–8m²)$18,000 – $35,000
Large / master bathroom$35,000 – $60,000
Luxury / full custom$60,000+

What Drives the Cost Up?

Waterproofing and tiling

Waterproofing is non-negotiable — it must meet Australian Standards and will be inspected. Quality tiling labour in Melbourne currently runs $60–$120 per m², and tile choice dramatically affects cost. Large-format tiles cost more to lay but fewer grout lines make cleaning easier long-term.

Fixtures and fittings

A mid-range tapware and shower set runs $800–$2,500. Premium European brands (Apaiser, Brodware, Rogerseller) push $3,000–$8,000 for tapware alone. Freestanding bathtubs add $1,500–$6,000 depending on material.

Moving walls or plumbing

Keep plumbing where it is if you can. Moving a toilet or shower waste adds $2,000–$8,000 and often requires council approval depending on the scope.

How to Get More for Your Budget

Choose large-format porcelain tiles (cheaper to lay than mosaics), keep your toilet in the same position, invest in quality tapware over a premium vanity, and use a feature tile on one wall rather than throughout. These choices give a high-end result for a mid-range price.

Get a bathroom renovation quote

Upload photos of your current bathroom and tell us what you're picturing. We'll come back with an honest estimate before we visit site.

Start your quote →

How Long Does a Bathroom Renovation Take?

A standard bathroom renovation in Melbourne typically takes 3–5 weeks on site once materials are on order. Allow 4–8 weeks for design, approvals, and material lead times before work starts. Total project timeline from first conversation to completion: 10–16 weeks for most bathrooms.